Civic Roam

Powered by 🌱Roam Garden

MMR - FY20 - Department of Transportation

  • Page Type:: Document Section
  • Parent Document:: Mayor's Management Report - Fiscal Year 2020
  • Content::
    • Roam Embed::
    • Obsidian Embed::
    • Raw Text::
      • DEPARTMENT OF
      • TRANSPORTATION Polly Trottenberg, Commissioner
      • DEPARTMENT OF TRANSPORTATION | Page 263
      • WHAT WE DO
      • The Department of Transportation
      • (DOT) is responsible for the condition
      • and operation of 6,300 miles
      • of streets, highways and public
      • plazas, 794 bridges and tunnels
      • and nine boats for the Staten Island
      • Ferry program. DOT operates over
      • 13,250 signalized intersections
      • and over 315,000 street lights and
      • maintains over 350 million linear
      • feet of markings on City streets and
      • highways. Safety for everyone using
      • the City’s roads, bridges and ferries is
      • the agency’s top concern. To increase
      • mobility, DOT manages the City’s Bus
      • Rapid Transit program, Select Bus
      • Service, in partnership with the MTA;
      • oversees the City’s bike share system;
      • and maintains over 1,316 miles of the
      • cycling network, including over 140
      • miles of on-street protected bicycle
      • lanes. DOT’s infrastructure programs
      • include bridge capital investment
      • and life-cycle maintenance, roadway
      • resurfacing and pothole repair, ferry
      • boat and terminal upgrades and
      • maintenance and street and sidewalk
      • reconstruction. DOT focuses on
      • delivering quality projects on time
      • and under budget by developing
      • and monitoring project plans and
      • schedules. DOT also manages the
      • Joint Traffic Management Center,
      • pedestrian ramp and sidewalk repair
      • and oversees the on-street parking
      • meters system. DOT’s alternative
      • fuel program promotes cleaner
      • vehicles using biodiesel, ethanol
      • and electricity in both the public and
      • private sectors.
      • FOCUS ON EQUITY
      • DOT focuses on equitable service delivery through its maintenance of critical transportation
      • infrastructure and commitments to safety and mobility for New Yorkers. This focus ensures
      • DOT provides its services in an equitable manner, including roadway, bridge, and sidewalk
      • maintenance, traffic planning and management and ferry operations. DOT developed Vision
      • Zero Borough Pedestrian Safety Action Plans by combining statistical data collected from traffic
      • crashes with community feedback gathered at safety workshops held across the five boroughs
      • and comments received through the interactive Vision Zero input map. There are 145 miles of
      • Select Bus Service routes, bringing fast and reliable service to residents living in transit-dependent
      • neighborhoods, such as Tremont, the Bronx; Bedford–Stuyvesant, Brooklyn; Jamaica, Queens; and
      • East Harlem, Manhattan. As part of its Better Buses Action Plan, DOT is implementing the same
      • SBS priority measures on local bus segments identified as slow and unreliable. These measures
      • include dedicated bus lanes, transit signal priority intersections and accessible bus stops. Criteria
      • for selecting segments include the prevalence of low-income and no-vehicle households. DOT’s
      • Mobility Management Program improves transportation opportunities for traditionally underserved
      • communities by advancing equity and accessibility. The program offers various resources, such as
      • staff training to ensure meaningful community engagement; contact information for community
      • organizations and service providers; and neighborhood surveys, focusing on travel behavior. DOT
      • launched its Employee Resource Groups (ERG) initiative to encourage employees to organize in
      • order to celebrate cultural connections, advocate for professional development and enhance
      • morale in the workplace. ERGs are instrumental in helping DOT achieve its key objectives of
      • workforce diversity, workplace inclusion and community understanding. There are six active ERGs,
      • including groups created around African American/Black, Women, Latinx and LGBTQ issues. DOT
      • is committed to fostering an equitable and competitive business environment while ensuring
      • procurements reflect the diversity of the City, including Minority and Women-owned Business
      • Enterprises (M/WBE). Efforts include restructuring contracts, expanding its pre-qualification
      • program for professional services and partnering with other City agencies and professional groups
      • to host meet-and-greet sessions for M/WBE vendors.
      • OUR SERVICES AND GOALS
      • SERVICE 1 Maintain the City’s transportation infrastructure.
      • Goal 1a Manage the City’s bridge inventory to achieve a high state of good
      • repair.
      • Goal 1b Maintain a state of good repair for the City’s streets, sidewalks and
      • highways.
      • Goal 1c Ensure timely repairs of the City’s street lights, traffic signs and
      • signals.
      • SERVICE 2 Provide a safe transportation network.
      • Goal 2a Improve safety for pedestrians, motorists and bus and bike riders.
      • Goal 2b Ensure passenger safety on the Staten Island Ferry.
      • SERVICE 3 Design and build transportation alternatives.
      • Goal 3a Increase mobility and accessibility throughout the City.
      • SERVICE 4 Design public space to facilitate livability.
      • Goal 4a Enhance quality of life through streetscape improvements.
      • SERVICE 5 Deliver projects on time.
      • Goal 5a Complete capital bridge projects on schedule.
      • Page 264 | MAYOR’S MANAGEMENT REPORT
      • HOW WE PERFORMED IN FISCAL 2020
      • SERVICE 1 Maintain the City’s transportation infrastructure.
      • Goal 1a Manage the City’s bridge inventory to achieve a high state of good repair.
      • In April 2016, New York State began to inspect and rate bridges using the American Association of State Highway and
      • Transportation Officials (AASHTO) protocol. DOT has been phasing in this ratings system for major bridges but continued
      • to rate pedestrian bridges on the old scale. There is currently no accepted translation from the previous ratings system.
      • City inspection crews are scheduled to begin rating bridges using the new AASHTO scale in early 2021. DOT expects to
      • publish bridge ratings in the Fiscal 2021 Mayor’s Management Report.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Bridges rated - Good or very good (%) (calendar year) 41.9% 41.8% 41.9% NA NA 40.7% 40.7% NA Up
      • – Fair (%) 58.1% 58.2% 57.8% NA NA * * NA Down
      • – Poor (%) 0.0% 0.0% 0.3% NA NA * * NA Down
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • Goal 1b Maintain a state of good repair for the City’s streets, sidewalks and highways.
      • In Fiscal 2020 DOT repaired a total of 173,328 potholes (local streets and arterials), 24 percent fewer than Fiscal 2019.
      • The average to time to close a work order improved to 1.7 days, along with an 11 percent drop in pothole work orders, in
      • correlation with a reduction in repair requests due to COVID-19. The number of lane miles resurfaced in-house dropped
      • to 1,093, the lowest output since Fiscal 2015, a result of fewer crews working during the PAUSE order. For the first time
      • in three years, DOT reduced its internal resurfacing goal to 1,100 lane miles, largely due to budgetary limitations.
      • FY 16 FY 17 FY 18 FY 19 FY 20
      • 239,426
      • 30,922 39,815 33,889
      • 196,038
      • Potholes Repaired
      • 269,329
      • 32,301
      • 229,160
      • Local Streets Arterial Highway System
      • 157,102
      • 16,226
      • FY 16 FY 17 FY 18 FY 19 FY 20
      • Lane Miles Resurfaced Citywide
      • 1,239.4
      • 1,321.2 1,321.9 1,324.0
      • 1,092.7
      • DEPARTMENT OF TRANSPORTATION | Page 265
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Streets maintained with a pavement rating of -
      • Good (%) 68.8% 69.8% 71.5% 71.6% 71.8% 71.0% 71.0% Neutral Up
      • – Fair (%) 30.4% 29.6% 28.0% 27.8% 27.6% * * Neutral Down
      • – Poor (%) 0.8% 0.6% 0.6% 0.6% 0.6% * * Down Down
      • « Average time to close a pothole work order where
      • repair was done (calendar days) 3.2 3.0 3.5 3.2 1.7 5.0 5.0 Down Down
      • Pothole work orders 50,085 49,687 51,833 42,960 38,151 * * Down Down
        • Potholes repaired - Arterial highway system 33,889 30,922 39,815 32,301 16,226 * * Down *
      • – Local streets 269,329 229,160 239,426 196,038 157,102 * * Down *
      • Lane miles resurfaced citywide (in-house) 1,239.4 1,321.2 1,321.9 1,324.0 1,092.7 * * Neutral Up
      • Average cost per lane mile resurfaced citywide ($) $149,102 $152,192 $161,406 $158,620 NA * * NA Down
      • Average in-house cost of asphalt per ton ($) $51.77 $44.91 $43.39 $48.75 NA * * NA Down
      • Average vendor cost of asphalt per ton ($) $55.43 $57.25 $62.86 $66.52 NA * * NA Down
      • Construction permits issued 549,495 597,358 646,079 686,703 617,140 * * Up Up
      • Inspections of permitted street work 708,276 707,330 595,665 546,906 601,731 * * Down Up
      • – Permitted jobs passing inspection (%) 76% 78% 70% 68% 70% 75% 75% Down Up
      • Post-audit inspections for completed street work 374,075 375,133 316,572 303,100 380,814 * * Neutral Up
      • – Completed street work that passed inspection (%) 77% 79% 70% 68% 69% * * Down Up
      • Adopt-A-Highway adoption rate (%) 80.7% 83.9% 84.8% 84.3% 84.4% 75.0% 75.0% Neutral Up
      • Adopted highway miles that receive a service rating of
      • good (%) 95.1% 100.0% 98.7% 93.3% 97.6% * * Neutral Up
      • « Parking meters that are operable (%) 99.2% 99.1% 99.1% 99.2% 99.7% 98.0% 98.0% Neutral Up
      • Total violations issued 67,065 46,285 48,937 50,315 39,828 * * Down *
      • Violations admitted to or upheld at the Office of
      • Administrative Trials and Hearings (%) 92.0% 92.0% 91.0% 92.0% 89.0% * * Neutral Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • Goal 1c Ensure timely repairs of the City’s street lights, traffic signs and signals.
      • Average response time to high priority traffic signal defects improved slightly, surpassing its target of two hours for the
      • fifth year in a row. Repair time for priority regulatory signs improved to 1.5 days, once again surpassing its target of three
      • business days. The overall average repair time for street lights (both ConEd and DOT) finished slightly higher than last year.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Average time to respond to high priority traffic signal defect
      • and make safe (hours:minutes) 1:50 1:47 1:57 1:36 1:35 2:00 2:00 Down Down
      • « Average time to repair priority regulatory signs after notification (business days) 1.8 1.7 1.8 1.7 1.5 3.0 3.0 Down Down
      • Average time to repair street lights - by DOT (calendar days) 2.9 3.0 2.7 2.7 2.9 * * Neutral Down
      • Average time to repair street lights - by ConEd (calendar days) 14.4 14.3 13.7 14.0 15.6 * * Neutral Down
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • Page 266 | MAYOR’S MANAGEMENT REPORT
      • SERVICE 2 Provide a safe transportation network.
      • Goal 2a Improve safety for pedestrians, motorists and bus and bike riders.
      • There were 211 traffic fatalities in Fiscal 2020, seven fewer than the prior year, while the number of crashes decreased by
      • 28 percent, in line with fewer vehicles travelling on streets and highways. Fatalities dropped by six percent for bicyclists
      • and pedestrians, while fatalities for motorists and passengers remained almost unchanged.
      • In Fiscal 2020, as part of its commitment to advance the Vision Zero Action Plan, DOT completed 126 street improvement
      • projects, installed 819 Leading Pedestrian Intervals and 112 speed humps and installed a record 54.2 million linear feet of
      • pavement safety markings. The Department also installed Accessible Pedestrian Signals (APS) at 222 intersections, almost
      • twice the number from last year, primarily as a result of a new policy to install APS at all new signal locations. APS are wired
      • to a signal pole and send audible and vibrotactile indications when pedestrians push a button installed at the crosswalk.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Overall traffic crashes 225,318 228,283 227,766 223,471 161,249 ò ò Down Down
      • « Citywide traffic fatalities 236 211 209 218 211 ò ò Neutral Down
      • – Bicyclists/pedestrians 152 148 128 137 129 * * Down Down
      • – Motorists/passengers 84 63 81 81 82 * * Neutral Down
      • Collisions involving DOT vehicles 370 497 480 422 346 * * Down Down
      • « Speed humps installed 395 365 409 318 112 250 250 Down Up
      • « Pavement safety markings installed (000,000) (linear feet) 45.2 45.0 29.1 43.0 54.2 ñ ñ Up Up
      • Intersections with accessible pedestrian signals installed 52 116 54 112 222 75 75 Up Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • Goal 2b Ensure passenger safety on the Staten Island Ferry.
      • During Fiscal 2020 the customer accident injury rate (CAIR) for the Staten Island Ferry increased to 1.58 per million
      • passengers. In total, there were 25 passenger injuries in Fiscal 2020 compared to 36 injuries reported in Fiscal 2019,
      • reflecting increased ridership. The CAIR represents all passenger injuries where professional medical treatment was requested
      • and does not necessarily mean each passenger suffered an injury requiring treatment. The CAIR is recognized by local and
      • State transportation agencies as an industry standard measure and is utilized to examine safety practices and evaluate
      • performance.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Staten Island Ferry - Customer accident injury rate (per million
      • passengers) 0.81 1.54 0.99 1.46 1.58 1.34 1.34 Up Down
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • SERVICE 3 Design and build transportation alternatives.
      • Goal 3a Increase mobility and accessibility throughout the City.
      • Staten Island Ferry ridership dropped to 15.9 million, a 37 percent decrease from last year, a direct result of COVID-19
      • and the PAUSE order. The average cost per passenger per trip is $8.80, a 51 percent increase from last year, mainly due to
      • the considerable drop in ridership. The ferry provides free, around-the-clock service between the South Ferry Terminal in
      • Manhattan and St. George Terminal in Staten Island. Generally, the ferry runs every 15 minutes during rush hour, and every
      • half hour or hour during nights and weekends. On-time ferry service improved to 96.6 percent, its highest rate on record.
      • Private ferry ridership decreased 23 percent to 12.7 million riders, largely due to the reduction in service for the PAUSE period.
      • There were also ridership shifts due to the permanent reconfiguration of three NYC Ferry routes (Lower East Side, South
      • Brooklyn, and Soundview). The ferry routes help reduce overcrowding on subways and buses, offer reliable transportation
      • DEPARTMENT OF TRANSPORTATION | Page 267
      • to underserved communities and expand the use of our waterways as an
      • essential component of the City’s transportation network.
      • During Fiscal 2020 users of the Bike Share Program activated a record 185,597
      • annual memberships, including renewals. Trips taken by all users, annual and
      • short-term, dropped slightly to 19.1 million. In response to COVID-19, Lyft, in
      • partnership with DOT, launched the Citi Bike Critical Workforce Membership
      • Program, providing the first responder, healthcare and transit workforce with a
      • free month of Citi Bike membership. Citi Bike also expanded into Washington
      • Heights, opening a new station near Columbia University Medical Center. This
      • station arrived months ahead of the full Phase 3 expansion which will bring 14
      • stations to transit-dependent neighborhoods, including Inwood and Sugar Hill
      • in Harlem, and Melrose, Mott Haven and Concourse in the Bronx.
      • DOT added over 82 lane miles to the City’s bicycle network, including 21.0
      • miles of protected bike paths. Completed bicycle projects include protected
      • bike lanes on Cypress Hills Street in Brooklyn, connecting Jamaica Avenue to
      • Jackie Robinson Parkway and Willis Avenue in the Bronx, between East 135th
      • and 148th Streets.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Staten Island Ferry - Trips that are on time (%) 92.3% 92.8% 92.4% 94.3% 96.6% 90.0% 90.0% Neutral Up
      • – Ridership (000) 23,067 23,920 24,497 25,223 15,865 * * Down Up
      • – Average cost per passenger per trip ($) $5.87 $5.16 $5.37 $5.42 $8.80 * * Up Down
      • Private ferry service - Total ridership (000) 10,883 11,202 13,827 16,413 12,693 * * Up Up
      • – Number of permanent routes 21 23 22 28 31 * * Up Up
      • Citi Bike annual membership 112,415 134,583 150,493 154,830 185,997 * * Up Up
      • – Trips (000) 12,234 14,981 17,176 19,106 19,050 * * Up Up
      • Bicycle lane miles installed 53.9 82.9 70.5 67.5 82.4 50.0 50.0 Up Up
      • Bicycle lane miles installed – Protected 16.0 16.0 23.9 20.2 21.0 * * Up Up
      • Bicycle racks installed 1,300 2,018 804 1,642 642 1,500 1,500 Down Up
      • « NYC adults who bike regularly (annual) (calendar year) NA 828,000 793,000 787,000 796,000 ñ ñ NA Up
      • Select Bus Service ridership (000) (annual) 65,433 77,902 88,148 92,422 114,536 * * Up Up
      • – Route miles (cumulative) 73 89 113 131 145 * * Up Up
      • Average travel speed (miles per hour) - Manhattan Central Business District 7.4 7.1 7.1 7.0 8.7 * * Up Up
      • Crossing points with pedestrian ramps installed (%) 96.8% 97.2% 98.1% 98.7% 98.7% * * Neutral Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • SERVICE 4 Design public space to facilitate livability.
      • Goal 4a Enhance quality of life through streetscape improvements.
      • The Department installed 273,000 square feet of pedestrian space during Fiscal 2020, 25 percent more than last year and
      • the second-highest total in the last nine years. Pedestrian space includes, but is not limited to, plazas, curb extensions,
      • sidewalks, safety islands and triangles. Notable street improvement projects completed include Myrtle Avenue between St
      • Nicholas Avenue and 65th Street in Queens; 11th Avenue between 42nd and 59th Streets in Manhattan; East 163rd Street
      • and Brook Avenue in the Bronx; and additional projects associated with the Safe Routes to Schools program which improve
      • pedestrian safety for school children citywide. No data was collected to update the Pedestrian Volume Index for 2020 as
      • the Bi-Annual Pedestrian Count Program was on hold as of late Calendar 2019. DOT is currently working to implement
      • an automated count program.
      • Ridership (000)
      • FY 16 FY 17 FY 18 FY 19 FY 20
      • Route Miles
      • FY 16 FY 17 FY 18 FY 19 FY 20
      • Select Bus Service (SBS)
      • 92,422
      • 65,433
      • 88,148
      • 113
      • 65
      • 131
      • 89
      • 77,902
      • 73
      • 15,865
      • 145
      • Page 268 | MAYOR’S MANAGEMENT REPORT
      • The NYC Plaza Program continues to thrive, helping to ensure all New Yorkers live within a 10-minute walk of high-quality
      • open spaces. Plazas enhance local economic vitality, pedestrian mobility, access to public transit and safety for all street
      • users. There are currently 82 plazas citywide that have either been completed or are in some phase of planning, design, or
      • construction. Of these, 63 plazas are now open to the public. Plazas recently completed include Zion Plaza in Brownsville,
      • Brooklyn, Van Name Van Pelt Plaza in Arlington, Staten Island and Johnny Hartman Plaza in West Harlem, Manhattan.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • « Pedestrian volume index 118.3 113.7 110.9 103.6 NA * * NA *
      • Pedestrian space installed (square feet) 353,439 499,025 353,968 443,518 273,000 * * Down Up
      • Existing newsstands converted to new model (%) 95.9% 97.4% 97.5% 98.4% 98.7% * * Neutral Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • SERVICE 5 Deliver projects on time.
      • Goal 5a Complete capital bridge projects on schedule.
      • The Department completed 19 bridge structure projects in Fiscal 2020; all were completed on schedule. Completed projects
      • include work on the approach spans and ramps of the Brooklyn Bridge, new Mill Basin Bridge over the Belt Parkway,
      • Macombs Dam Bridge fender system, 155th Street Viaduct and post-Superstorm Sandy repairs to 12 movable bridges
      • and two tunnels. DOT is dedicated to improving its project delivery processes and is expanding its efforts to facilitate the
      • initiation of capital projects on accelerated schedules, through partnerships with federal, State and local partner agencies.
      • Accelerated scheduling is designed to help reduce costs and the time it takes to deliver completed projects to the public.
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • Bridge projects (structural work) substantially completed on
      • schedule (%) 100% 100% 100% 100% 100% 100% 100% Neutral Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • AGENCY-WIDE MANAGEMENT
      • Performance Indicators
      • Actual Target Trend
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • Cases commenced against the City in state and federal court 2,209 2,234 2,237 2,299 1,944 * * Neutral *
      • Payout ($000) $62,940 $95,495 $89,300 $79,990 $93,667 * * Up Down
      • Workplace injuries reported 427 456 474 506 440 * * Neutral Down
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • AGENCY CUSTOMER SERVICE
      • Performance Indicators Actual Target Trend
      • Customer Experience FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • E-mails responded to in 14 days (%) 98% 97% 99% 99% 99% 95% 95% Neutral Up
      • Letters responded to in 14 days (%) 98% 97% 94% 97% 97% 95% 95% Neutral Up
      • Calls answered in 30 seconds (%) 21% 12% 68% 54% 88% * * Up Up
      • Average customer in-person wait time (minutes) 4:11 3:07 3:32 3:58 5:46 * * Up Down
      • Requests for language interpretations and translations received 1,415 2,209 1,890 1,396 1,161 * * Down *
      • CORE customer experience rating (0-100) 98 100 99 NA 99 95 95 NA Up
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • DEPARTMENT OF TRANSPORTATION | Page 269
      • Performance Indicators Actual Target Trend
      • Response to 311 Service Requests (SRs) FY16 FY17 FY18 FY19 FY20 FY20 FY21 5-Year
      • Desired
      • Direction
      • Percent meeting time to close - Street Condition - Pothole (30
      • days) 100% 100% 100% 100% 100% 98% 98% Neutral *
      • Percent meeting time to first action - Street Light Condition -
      • Street Light Out (10 days) 98% 98% 99% 99% 97% 98% 98% Neutral *
      • Percent meeting time to first action - Traffic Signal Condition -
      • Controller (0.1 days) 74% 75% 71% 75% 78% 80% 80% Neutral *
      • Percent meeting time to first action - Street Condition - Failed
      • Street Repair (10 days) 92% 89% 91% 90% 89% 85% 85% Neutral *
      • Percent meeting time to close - Broken Parking Meter - No
      • Receipt (21 days) 68% 92% 90% 100% 100% 90% 90% Up *
      • « Critical Indicator “NA” Not Available ñò Directional Target * None
      • AGENCY RESOURCES
      • Resource Indicators Actual¹ Plan²
      • FY16 FY17 FY18 FY19 FY20 FY20 FY21 5yr Trend
      • Expenditures ($000,000)³ $910.3 $957.9 $983.7 $1,040.4 $1,106.9 $1,155.6 $1,099.9 Up
      • Revenues ($000,000) $381.5 $388.2 $410.4 $454.9 $389.7 $445.5 $440.2 Neutral
      • Personnel 5,315 5,502 5,549 5,704 5,817 5,874 5,779 Neutral
      • Overtime paid ($000,000) $62.1 $62.3 $64.8 $66.1 $45.9 $48.7 $46.5 Down
      • Capital commitments ($000,000) $1,151.7 $1,602.9 $2,163.4 $1,209.7 $601.9 $1,593.1 $1,881.9 Down
      • ¹Actual financial amounts for the current fiscal year are not yet final. Final fiscal year actuals, from the Comptroller's Comprehensive Annual Financial Report, will be reported
      • in the next PMMR. Refer to the “Indicator Definitions” at nyc.gov/mmr for details. ²Authorized Budget Level ³Expenditures include all funds “NA” - Not Available * None
      • SPENDING AND BUDGET INFORMATION
      • Where possible, the relationship between an agency’s goals and its expenditures and planned resources, by budgetary unit
      • of appropriation (UA), is shown in the ‘Applicable MMR Goals’ column. Each relationship is not necessarily exhaustive or
      • exclusive. Any one goal may be connected to multiple UAs, and any UA may be connected to multiple goals.
      • Unit of Appropriation
      • Expenditures
      • FY19¹
      • ($000,000)
      • Modified Budget
      • FY20²
      • ($000,000) Applicable MMR Goals³
      • Personal Services - Total $510.5 $527.9
        • 001 - Exec. Admin. and Planning Management $66.6 $70.6 All
        • 002 - Highway Operations $187.9 $198.5 1b, 2a, 3a, 4a
        • 003 - Transit Operations $62.2 $62.1 2a, 2b, 3a, 4a
        • 004 - Traffic Operations $116.6 $117.5 1b, 1c, 3a, 4a
        • 006 - Bureau of Bridges $77.2 $79.2 1a, 5a
      • Other Than Personal Services - Total $529.9 $579.0
        • 007 - Bureau of Bridges $23.5 $29.2 1a, 5a
        • 011 - Executive and Administration $70.1 $69.4 All
        • 012 - Highway Operations $124.0 $122.8 1b, 2a, 3a, 4a
        • 013 - Transit Operations $46.4 $48.9 2a, 2b, 3a, 4a
        • 014 - Traffic Operations $265.7 $308.7 1b, 1c, 3a, 4a
      • Agency Total $1,040.4 $1,106.9
      • ¹Comprehensive Annual Financial Report (CAFR) for the Fiscal Year ended June 30, 2019. Includes all funds. ²City of New York Adopted Budget for Fiscal 2020, as of June
        1. Includes all funds. ³Refer to agency goals listed at front of chapter.
      • “NA” Not Available *None
      • Page 270 | MAYOR’S MANAGEMENT REPORT
      • NOTEWORTHY CHANGES, ADDITIONS OR DELETIONS !
      • • Fiscal 2020 data for ‘Pedestrian volume index’ is not available. The Bi-Annual Pedestrian Count Program is currently on
      • hold as of late Calendar 2019. Pedestrian counts were not collected in spring 2020 due to COVID-19. DOT is working
      • to implement an automated count program and expects to provide an update for the Fiscal 2021 Mayor’s Management
      • Report.
      • • DOT developed a new system for street ratings which aligns with the old system. Numbers unavailable in the Fiscal
      • 2019 Mayor’s Management Report have been added.
      • • Fiscal 2020 data for the three indicators that report data on the average cost of asphalt (in-house and vendor) and
      • roadway resurfacing is not yet available and will be reported in the Fiscal 2021 Preliminary Mayor’s Management Report.
      • • In Goal 3a, ‘Bicycle lane miles—protected’ has been added as a subset of ‘Bicycle lane miles—total’.
      • ADDITIONAL RESOURCES
      • For more information on the agency, please visit: www.nyc.gov/dot.
MMR - FY20 - Department of Transportation